The project is located in Chengdu, the capital of abundance. It was built in 2018 and is mainly used for processing pebbles with a designed capacity of 2 million tons/year.
Finished product specifications: 0-5mm machine sand, 1-16mm, 16-20mm, 20-31.5mm, mainly for local commercial and Chengdu third ring high speed materials. The complete production line is designed and installed with a green and environmentally friendly concept. The operation uses a visual PLC central intelligent control system to monitor the running status of the equipment in real time.