Green Breakdown Factory
Project Name: Green Fragmentation Factory
Raw materials: Located in the ancient capital Xi'an, processing natural sand stone
Use equipment: The complete production line is designed with a modular chemical plant, and the operation uses a visual PLC central intelligent control system to monitor the operating status of the equipment in real time.
Finished product requirements: 0-5mm, 1-10mm, 10-25mm, 25-31 .5 mm, mainly for local urban construction materials and intercity expressway materials.
Production requirements: 2 million tons per year
|
Case Details