Introduction to Case Set Production Line
Green mine environmentally friendly crushing factory
Project name: Green mine environmental protection crushing factory
Raw materials: South of beautiful clouds, hard limestone
Use equipment: the complete production line adopts the green mine environmental protection concept design, operation adopts the visual PLC central intelligent control system, real-time monitoring equipment operation status.
Requirements: 0-5mm, 1-10mm, 10-20mm, 20-26 .5 mm, mainly for local urban construction materials and intercity expressway materials
Production requirements: 1.5 million tons/year
|
Case Details